Total budget

€515,000 (excluding tax)

Project Management

Neinver

Project Management

Evinrude

Design and sizing

Jura Natura Services

Hydrological restoration of an 8-hectare peatland, including the installation of over 700 linear meters of pathways on distribution plates.

Phase 1: Nearly complete clearing of the peatland using mechanized logging equipment operated by a subcontractor.

Partial stump removal and grinding of stumps and wood debris using a Prinoth Raptor 300 mulcher, followed by storage of the materials.

Phase 2: Neutralization of 5 drains, including the installation of over 700 ml of conduit on distribution plates to ensure access in sensitive areas. Thorough cleaning of the bottom and sides of the drains prior to backfilling.

Installation of waterproofing systems comprising 12 three-ply panels, 7 wooden plank retaining walls ranging from 5 m to 12 m in width, and 3 steel sheet pile retaining walls ranging from 7 m to 17 m in length at strategic locations, with depths ranging from 2 m to 2.5 m. Some of the fences were covered with anti-erosion wood wool.

Complete dismantling of the facilities and restoration of the municipal access road.

Learn more about our other compensatory projects

Do you have an ecological offset project?

Jura Natura Services is here to help.

We are here to discuss your ecological compensation projects and assist you in implementing them.