Total budget

€23,000 (excluding tax)

Project Management

Reilé Law Firm

Project Management

City of Valdahon

CAD design and construction of a 10-meter-long wood-and-steel pedestrian bridge.

The steel structure was fabricated from hot-dip galvanized steel and then painted before being installed on the concrete foundations.

The decking and wooden railings are made of untreated Class IV oak. A metal handrail is integrated into the 1.10-meter-high railings to ensure user safety.

Check out our other public space projects

Do you have a renovation project?

Jura Natura Services is here to help.

Please feel free to contact us to find out how we can assist you with your public infrastructure projects.