Total budget

€688,725 (excluding tax)

Project Management and Construction Management

Joint Association for Aquatic Environments of the Upper Doubs

Work began with the workshop processing of 450 cubic meters of spruce rafters, which were turned into planks and then transported by helicopter to the peat bog site.

A total of 120 meters of ditches were filled in by installing panels and erecting 16 meters of fencing downstream of the ditches. The fencing was covered with 1,980 cubic meters of peat.

We then constructed 5 single-layer palisade dikes and 6 double-layer waterproof flow-diverting palisades, measuring 481 linear meters and 612 linear meters, respectively. To ensure an even horizontal distribution of the water flow, we installed coconut fiber geotextile and bentonite mats.